What a Mining Project Needs Before Tokenization
The records a reviewer checks first, how exploration-stage and junior projects are treated, and what verification does not establish.

Before a mining project can be considered for tokenization, it needs an evidence base that a professional reviewer can check: licences, geological and drilling data, laboratory results and, where they exist, technical reports. This guide lists what to prepare, how exploration-stage and junior projects are treated, and what verification does and does not establish.
What documents does a mining project need?
Start with what the project already has. A reviewer will look for five groups of records.
Project and licence information
Project name, location, country, commodity and development stage, together with the licence or permit that gives the right to explore or mine, its holder and its status. Ownership of the right is the first question in any tokenization structure, so the documents that show who holds it come first.
Geological and exploration data
Geological mapping, field observations, drilling records, sampling logs and exploration datasets. Dated records with locations and methods are more useful than summaries.
Laboratory documentation
Assay results, laboratory certificates, sample records and supporting analytical information. A reviewer will want to trace each result back to a sample and a laboratory.
Technical reports
Geological assessments, resource or reserve reports and other professionally prepared technical documents. Reports prepared under a recognised code such as JORC or NI 43-101 are signed by a competent or qualified person and state what they do and do not cover. Include them where they exist.
Economic and feasibility studies
A preliminary economic assessment, scoping study or feasibility study, where one exists and applies to the project's stage.
Can an exploration-stage or junior project be considered?
Yes. A formal resource or reserve report is not assumed for every exploration-stage project. Junior mining companies can share the information they have for initial screening even when the project has not reached feasibility or production. The stage changes what can be verified and what can be claimed, not whether the records are worth organising.
What changes is the wording. Exploration observations and assay results are not a declared mineral resource, and they should not be described as one.
What happens after the records are gathered
MPC follows a four-stage framework: Verify, Structure, Tokenize and Manage.
- Verify. The project's basic information and data are screened first. Records and technical reports may then be reviewed by qualified persons, technical experts or professional institutions; the scope of each review depends on the evidence and on the reviewer's authority.
- Structure. Verified information becomes structured digital records with traceable sources and verification history. Legal counsel reviews asset rights, agreements and jurisdictional requirements, and an eligible issuer or a project-specific SPV may be needed.
- Tokenize. Once the legal, technical and regulatory conditions are met, an eligible asset may move toward digital issuance.
- Manage. Records, verification references and project updates are kept through the asset's lifecycle, from exploration to development and production.
The full sequence is in the whitepaper chapter Mining RWA Lifecycle, and How It Works gives a shorter overview.
What verification does not do
Professional verification does not establish mineral ownership, guarantee the accuracy of every submitted statement or confirm that a project qualifies for token issuance. It is not financing, a funding commitment or an investment recommendation. Legal eligibility, asset valuation, regulatory approval and issuance are separate questions.
Verification records and on-chain proofs have defined limits, set out in the dApp verification limits. Critical Minerals Provenance and ESG applies the same limits to origin and ESG claims.
A worked example: Tsagaan Tolgoi
Tsagaan Tolgoi is MPC's first reference case. Its exploration documentation log shows how field observations, samples and drill-core records are organised into a project record, and Technical Reports lists the published field and laboratory records.
Tsagaan Tolgoi is an exploration-stage project and an infrastructure reference case, not a completed tokenization. Its exploration licence belongs to an independent licence holder, and no JORC- or other CRIRSCO-compliant resource or reserve report has been issued.
Talking to MPC about a project
If you hold a mining project and want to discuss it, use the contact form and choose Project submission. Give the project name, jurisdiction, commodity, development stage and a short overview of the data you have. Do not send confidential documents with the first message; confidential materials are exchanged only under a separate NDA.
FAQs
What documents do I need to tokenize a mine?
Licence and ownership records, geological and exploration data, drilling and sampling records, laboratory results and any technical reports or economic studies. The licence and the right it gives come first, because every structure depends on them.
Can a junior mining company tokenize an exploration project?
An exploration project can be screened and its records organised and verified. Whether it can be tokenized depends on its legal structure, the rights involved and the applicable requirements, not only on its stage.
Is a JORC or NI 43-101 report required?
Not for every exploration-stage project. Where such a report exists it should be included, and without one the project should not be described as having a resource or reserve.
Does verification guarantee tokenization or funding?
No. Verification does not guarantee approval, financing or token issuance. Each project is assessed on its evidence, legal structure and applicable requirements.
How long does verification take?
It depends on the records available, their quality and the scope of the review. MPC has not published a standard timeline.